Draugen oil platform norway3/18/2024 ![]() The oil produced is transported to Njord Bravo through a pipeline and further to the market by tankers. The development of the field includes a floating steel platform called Njord A, with integrated deck consisting of drilling and processing facilities and living quarters, and Njord B storage vessel. The plan for development and operation (PDO) for Njord was approved in 1995. Remaining reserves stand at around 25.9 million sm 3. ![]() The field exhibits a complex fault pattern with partial communication between the segments.ĭue to the less decline in pressure as anticipated, the recoverable volumes were higher as compared to the plans for development and operation (PDO) estimates.Īdditionally, the installation of the Åsgard subsea gas compressor increased the production of oil and gas from the field.Īccording to the Norwegian Petroleum Directorate, Njord field had recoverable reserves of 67.2 million sm 3 in oil equivalents originally. In 1997, Njord field began production from three reservoirs-Tilje, Ile and Åre. The adjacent Hyme oil field was tied back to the Njord A platform using a subsea installation in 2013. The location is 30km west of the Draugen Field. Njord Field is located offshore around 130km northwest of Norwegian municipality within Block 6407//10 in the Norwegian Sea. The field resumed production in December 2022 and is expected to remain in production in 2040.Īs of December 2020, around NOK42.03bn ($4.25bn) had been invested in the Njord field. In 2016, an extensive modification work on the Njord A platform and storage vessel was initiated.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |